Portfolio

Highlights

1989 – 2011

  • Supplied and serviced more than 130 bays of 132kV GIS Switchgears for 19 substations for TNB & the private industry and, >50 units of Transformers with an installed capacity exceeding 4,000MVA

  • Main supplier for TNB Nationwide Power Quality Monitoring System (PQMS): design, supply, installation, analysis and T&C in 130 substations since 1992

  • Design, supply, deliver and maintain more than 200 units of SFg LV 415V Ground Mounted Capacitor Banks to TNB Regional PE

  • Supplied more than 500 set of Hydraulic Crimping tools & Accessories and Live Line Cable Cutter to TNB, SEB and contractors

  • Supply, Erect & Commissioning of 132kV and 11kV 1x30MVA Transformer and ancillary equipment with Civil Works for Masjid Tanah 132/11kV substation

  • Supply, installation & Commissioning 64 units of Portable Power System Analyzer and related Accessories at TNB regionals (TNBES)

2007 – 2010

  • Supply, Delivery, Installation Testing & Commissioning of 132kV/11kV Substation in Huntsman Tioxide

  • Supply, Delivery, Installation Test & Commission of 132kV /11kV Substation in Pelabuhan Tanjung Pelepas: Battery DC System, Battery Monitoring System, GIS, Transformer, Surge Arrester, Hot Online Purifier, NER System, Gas Handling, ENMS System, Cast Resin Transformer

  • Sub-Contractor for the Design, Supply Deliver, Install, Test & Commission and Maintenance of mono-crystalline Silicon BIPV (27kWp) System and all Ancillary Work at Car Park Roof of PTM-Zeo Building (PTM)

  • Suria 100 3rd call – Supply, Delivery, Installation, Testing & Commissioning of Solar Photovoltaic for 4 units Private House ~ 39kw

  • Supply, Delivery & Commission of Solar Hybrid System in Pulau Kapas (100kWp)

2012

Supply, Delivery, Install, Test & Commission of Solar Equipment at RPS Kemar Gerik including Inverter & Controller Solar Photovoltaic, Lead Acid Battery for Solar Hybrid Stations, Battery Monitoring System and Solar PV Monitoring System

2016 – 2019

  • Supply, and delivery of 18 units 12kV, 5MVAr MV Capacitor Bank to TNB regional substation

  • Supply, Delivery of 3380 units of Pole Mounted Capacitor 525V

  • Supply and Delivery total of 104 units LV Ground Mounted Capacitor Bank to TNB Regional PE

  • Design, Supply, and Delivery of more than 2000 units of 11kV and 33kV SFg Voltage Discharge Stick to TNB and Contractors

  • Service and Maintenance of 210 GIS at TNB 132/33kV Substation

  • Pioneer contractor and developed alongside TNB – Supply, Delivery, Install, Test & Commission Community Scale Energy Storage System (CESS) at TNB substation in Johor Bahru

  • Supply, Deliver, Install, Test & Commission of 120 units LV Ground Mounted Capacitor Bank to TNB regional PE

  • Awarded LOI for Supply, Deliver, Install, Test & Commission of battery charger / EFI / MV cap bank

2020 – 2022

  • Awarded 360 units 11kV & 33kV Auto Recloser & Accessories to Sarawak Energy

  • Maintenance, Replacement, Testing, and Commissioning of 132kV GIS at Port of Tanjung Pelepas

  • Supply, Delivery, Install, Test & Commission of Temperature, Humidity and Partial Discharge Sensor for MV and LV asset monitoring to TNBR including Software for Centralized Monitoring System

  • Supply & Delivery of Compact Sub to a major energy distributor

  • To provide Load Datalogging Analyzer & Report and supply and install single step capacitor to Air Selangor

  • To provide 2 years’ Service & Maintenance of PV Monitoring System for Astro

  • Supply, install, test & commission of Fault Current Limiter to a petrochemical plant in Johor

  • Design and Development Online Energy Monitoring Cloud Planform to SEDA

2023 – 2025

  • Supply, Delivery Secondary Equipment to TNB Grid 275kV and 132kV substation - Surge Arrester, CVT and Circuit Breaker

  • Supply and Delivery of Overhead Accessories to TNB, SEB, SESB Distribution System – LV Dead End clamp, Fuses, LV Surge Arrester, HV Glass Disc and so on.

  • Supply and Delivery of Overhead Line Hardware to TNB, SEB, SESB Distribution System – Stay Rod, Stay Wire.

  • Supply and Delivery of Earthing & Grounding Materials to TNB, SEB – Copper Strips, Copper Clad.

  • Design, Supply, Install, Integrate, Test, Deliver, Commissioning Training the Green Hydrogen Generator and Fuel Cell System for EV Charging Station at TNBR, completed in 2024

  • Refurbishment, Maintenance and Relocation of Community Scale Energy Storage System (CESS) – completed in 2024

Gallery